
Installation
8 312668W
Installing Extension and Nozzle on Meter
1. Thread the sealing nut (26c) onto the extension
(26a).
2. Thread extension into meter outlet at least three full
turns to tighten securely. (F
IG. 7). (Over torquing
may cause casting meter to split)
3. Thread new nozzle (26b) onto extension. With an
open-end, adjustable wrench.Tighten it firmly.
4. Open all dispense position shut-off valves (B, F
IG.
8) and start the pump to pressurize the system. See
Operation, (LDM5 Meters - page 13; LDP5 Meters -
page 22), for proper operation of meter.
• To ensure dispensing accuracy, purge all air
from the fluid lines and dispense valve before
you use it.
• Set the system flow to the desired flow rate,
which is typically 1.5 gpm. Do not exceed a
5-gpm flow rate.
F
IG. 7
NOTICE
• Do not overtighten extension to sealing nut. Over
tightening may cause meter casting to split.
• Do not use a twist/lock or manual shut-off nozzle.
You must use an automatic nozzle on the meter or
the meter could be damaged.
Only tighten nozzle with the wrench on the flats of
the nozzle bushing. Do not disassemble the
bushing from the nozzle. Disassembly will affect
the performance of the nozzle.
FIG. 8
Comentarios a estos manuales