
Installation
3A0860F 3
Installation
The USP Valve should be ready to install in your sys-
tem. It has been factory-tested and should not require
any additional modification.
As long as lubricant is supplied under pressure, the
valve will continue to operate . Whenever lubricant flow
ceases, the valve pistons stop. When flow resumes, it
will start again at the same point in the discharge cycle.
NOTE: The manufacturers of the machine tool and its
component bearings should be consulted to ensure that
the ISO 18/14 cleanliness level is adequate.
Outlet Adapters
Each block ships with the correct number of outlet
adapters. Install one adapter into each open outlet port.
Outlet adapters have standard threads for interfacing
with tube fittings.
Recommended Tube Fittings
• Fittings should have a maximum 9/16 in. (14 mm)
hex.
USP Divider Port Combination
USP divider block outlets can be combined to increase
the amount of lubricant for a particular outlet.
1. Remove the outlet adapter from block.
2. Remove face seal (a) from outlet adapter (b) (F
IG.
1).
3. Plug outlet adapter (b) with user supplied plug (c) to
double the output volume.
Lubricant from the plugged outlet adapter is redirected
to the next outlet on the USP divider block flowing in a
clockwise order, following direction arrows (A) stamped
on block (see F
IG. 1).
For example in
FIG. 1: Removing face seals and plug-
ging 2 outlet adapters will triple the amount of lubricant
at the next outlet. This outlet will include the output of
plugged outlets that are now rerouted as well as it’s own
output.
Pressure Relief Procedure
Loosen inlet connection (B) to allow air to bleed from fit-
ting and relieve pressure in block.
Purging Air From System
Before machine operation is resumed, following mainte-
nance or repair procedures, manual system air purging
is required.
NOTICE
Supplied outlet adapters are required for full func-
tionality and testing.
FIG. 1
A
ti13744
a
b
c
3x output
FIG. 2
B
ti13745
Comentarios a estos manuales